Case Study: Power Integration Advisory at Briscoe Earl’s Court
Integrating Gas-Fired Power Supply into an existing brownfield grid requires precision intelligence. A look at how AET provided the technical due diligence required…
The Challenge: Brownfield Integration
At Briscoe Earl’s Court, the challenge was clear: integrate a modern Gas-Fired Power Supply into an existing distribution network without disrupting service or compromising safety.
The AET Solution
Leveraging our “Optimise” pillar, our team conducted rigorous problem definition and analysis. We mapped the load profile, identified potential fault lines, and engineered a bespoke integration plan.
The result was a seamless transition that not only stabilised power supply but optimised fuel consumption for the estate. This project exemplifies our ability to provide the “intelligence” required for major infrastructure decisions.
Subscribe Now
Get exclusive technical insights and member only discounts delivered to your inbox. Join the Antrum Engineering community today to stay ahead with our latest power solutions and special offers.
SERVICES
QUICK LINKS
TERMS
SOCIAL MEDIA
Follow Us
Customer Support?
Customer Care
Engineering Projects
- Live Chat
Use our Live Chat at the bottom right corner
Copyright © 2026 Antrum Engineering & Technology Company Limited

